Vulnerability in the Advanced Networking Option component of Oracle Database Server. Supported versions that are affected are 12.1.0.2, 12.2.0.1 and 19c. Difficult to exploit vulnerability allows unauthenticated attacker with network access via Oracle Net to compromise Advanced N...
Product
oracle Primavera P6 Professional Project Management vulnerabilities
4 published CVES affecting oracle Primavera P6 Professional Project Management, from public sources (CVE.org, NVD, CISA KEV, FIRST EPSS, OSV).
- Total
- 4
- Critical
- 0
- High
- 2
- Medium
- 2
- Low
- 0
- Unscored
- 0
- CISA KEV
- 0
Latest oracle Primavera P6 Professional Project Management CVEs
Newest publication first
-
HighCVSS 7.5 EPSS 2.9%
-
HighCVSS 7.3 EPSS 0.43%
Vulnerability in the Primavera P6 Enterprise Project Portfolio Management product of Oracle Construction and Engineering (component: Core). Supported versions that are affected are 16.2.0.0-16.2.19.0, 17.12.0.0-17.12.16.0, 18.8.0.0-18.8.16.0, 19.12.0.0 and 20.1.0.0. Easily exploi...
-
MediumCVSS 6.1 EPSS 2.2% PoC
A vulnerability was found in Hibernate-Validator. The SafeHtml validator annotation fails to properly sanitize payloads consisting of potentially malicious code in HTML comments and instructions. This vulnerability can result in an XSS attack.
-
CVE-2018-0734 Timing attack against DSA
PublishedMediumCVSS 5.9 EPSS 12.2%The OpenSSL DSA signature algorithm has been shown to be vulnerable to a timing side channel attack. An attacker could use variations in the signing algorithm to recover the private key. Fixed in OpenSSL 1.1.1a (Affected 1.1.1). Fixed in OpenSSL 1.1.0j (Affected 1.1.0-1.1.0i). Fi...
Sources: CVE.org, NVD, CISA KEV, FIRST EPSS, OSV and public exploit-reference metadata. Product matching comes from the published CVE records. A proof-of-concept means public code exists; it is not evidence of exploitation.